You are here: HOME > COMPUTING FACILITIES

 

¨ COMPUTING FACILITIES

 

S.No

Particulars

Requirements as per Norms (1:4 all undergraduate UG Programmes and 1:2 for MBA/MCA/ PGDM/ PGDBM)

Availability

1.

No of Computer terminals

Up to 2008-2009

B.Tech (UG)

1) ECE = 120+120+120+90 =  450

2) CSE = 120+120+120+60 =  420

3) EEE = 60+60+60+60      =   240

4) IT = 60+60+60              =  180

Additional Intake in IT

yet to get                          = 060

                                           1350

1350/4 = 338 Nos


MCA  this is first year batch
60/2 = 30 Nos.


Total 368 Nos.

376 Nos

2.

Hardware Specification

6 servers are there

6 Servers & 370 Clients are available

1) Server – I & II

Intel Xeon Processor 2.8GHz Intel Server Mother Board, 120 GB HDD, 1 GB RAM, 17” Color Monitor, Optical Mouse Combo Drive, Key Board.

 

2) Server – III & IV

Intel Dual core 2.66 Ghz processor, 965 Ry mother board 120 GB HDD, 1 GB RAM, Optical Key board, mouse, Combo Drive, 17’ Color Monitor.

 

3) Server – V & VI

Intel core duo processor, 3.6 Ghz, Intel G31 mother Board, 1GB RAM 17” color monitor, 160 GB HDD, Optical Key board & mouse, DVD writer.

 

4) 120 Clients:

Intel Pentium IV 1.6 GHz Processor, Intel original Motherboard, 80 GB HDD, 512 SDRAM, 15” Color Monitor, CD Rom, Scroll Mouse, Key board

 

5) 120 Clients:

Intel Pentium IV 3.0 GHZ Processor, Intel D102 GGCL Mother Board, Seagate 80GB HDD, 256MB RAM DDR-2, LG 15” Black Monitor, Logitech Keyboard + Optical Mouse Black, Umax PIV Cabinet black, cabinet cooling fan

 

5) 130 Clients:

Intel core 2 Duo 3.6 GHZ Processor, Intel G31 original Mother Board, W.D 160 GB HDD SATA-2, 1GB RAM DDR-2, LG 15” color Monitor, Optical Mouse & Key board

 

3.

No of terminals of LAN/WAN

50 % of no. of terminals

260 System on LAN

4.

Relevant Legal Software

Application

(at least 8 eight applications software packages)

System


at least 2 (two) system software

Application Software

System Software:

I). BORLAN C++ - 5.0

II), TURBO C

III) ANSI C’

IV)JAVA–J2SDK–1.6.0Update10

V)JAVA–J2RE–1.6.0Update 10

VI) Apache Tomcat – 2.29

VII) MAT LAB – VII

VIII) ORCAD (P. SPICE)

IX) MASAM

X) MULTISIM

XI) MICROWIND

XII) KEIL

XIII) MY SQL 2008

XIV) VISUAL STUDIO 2005

XV) VISUAL STUDIO 2008

XVI) MS OFFICE – 2000

XVII) MS OFFICE XP  WHT PAGE

XVIII) MS OFFICE 2003

XIX) MS OFFICE 2007

XX) ORACLE – 8i

XXI) ORACLE – 9i

XXII) ORACLE – 11g

XXIII) SUBSCRIPTION-MSDN

I). Windows operating System

II.) Windows – 98

III). Windows – 2000

IV). Windows – 2003 Server

V.) Windows XP

VI). Windows – Vista

VII). Windows – Long Horn

VIII). Wind Media centre

Linux Operating System

IX). Linux – 9 Red Hat

X). Suse Linux – 10

XI). Fedora Core – 5

XII) Fedora Core-8

XIII) Red Hat A Linux

XIV) SUN Solaris Operating System

           

5.

 

Peripheral's)/ Printers

Printers : Computer terminal ratio 1:10

 

I) TVS – 245 DOT MATRIX - 4

II) HP-LASERJET – 1020 – 4

III) HP-LASERJET – 1007 – 2

IV) SAMSUNG-1017p LASERJET – 2

V) LCD PROJECTOR – 3

VI) SCANNERS – 3

VII) XEROX MACHINES – 3

VIII) 85 KV GENERATOR WITH 16 UPS

 

6.

Internet Accessibility (in kbps & hrs)
 
 

1 MBPS with unlimited hours through satellite


 
   
Whether the computer facilities are suitable for the existing programmes ?     Yes                              No


                                 

 
 
 
 

 


Copyright © 2008 Khader Memorial College of Engineering & Technology, All Rights Reserved.
Best viewed in 1024 X 768 Resolution with IE 5.0 or Higher. Website Registration, Designed & Maintained by Ebiz4india - A Web Hosting Company